Capital Contribution (Electricity)
1. NEW APPLICATIONS (DOMESTIC/ GOVERNMENT BUILIDING):
MAX DEMAND (KVA) |
DOMESTIC/ GOVERNMENT (EXCLUDING FLATS) |
---|
CLASS. |
CC (BD) |
---|
1-170 | D1 | 10 PER KVA |
>170 | D2 | 20 PER KVA for part of load exceeding 170 KVA |
| D3 | Minimum charge of BD 250/- per main service |
| D4 | Exempted building ( no charge )* |
NOTE: - Deduction for building substation room is as per deduction table.
- Minimum capital contribution is 250/- BD for any new main service (U/G or O/H)
- Exemptions are subject to Prime Minister's Office Orders.
|
*Same classification code can be used for any type of building being exempted from capital contribution fees.
2. NEW APPLICATIONS ( FLATS):
MAX DEMAND (KVA) |
FLATS |
---|
CLASS. |
CC (BD) |
---|
1-170 | F1 | 15 PER KVA |
171 - 5000
| F2 | 35 PER KVA for part of load exceeding 170 KVA |
| F3
| Minimum charge of BD 250/- per main service |
NOTE: - Deduction for building substation room is as per deduction table.
- Minimum capital contribution is 250/- BD for any new main service (U/G or O/H)
- CC is based on total maximum demand of all flats.
- Above rates to be used even if the flats are part of non-domestic buildings supplied at low voltage.
- Maximum demand is excess of 5000 KVA to be a medium/ high voltage customer.
|
3. NEW APPLICATIONS ( NON-DOMESTIC BUILDINGS):
MAX DEMAND (KVA) |
FLATS |
---|
CLASS. |
CC (BD) |
---|
1-3500 | H1 | 35 PER KVA |
| H2 | Minimum charge of BD 250/- per main service |
NOTE: - Deduction for building substation room is as per deduction table.
- Minimum capital contribution is 250/- BD for any new main service (U/G or O/H)
- Maximum demand is excess of 3500 KVA to be a medium/ high voltage customer.
|
4. NEW APPLICATIONS (MEDIUM/ HIGH VOLTAGE CUSTOMERS):
MAX DEMAND (KVA) |
MEDIUM VOLTAGE CUSTOMERS |
---|
CLASS. |
CC (BD) |
---|
≤12000 | H3 |
MEDIUM VILTAGE CUSTOMERS (SUPPLY AT 11KV), MD ≤ 12000KVA |
15 per KVA The developer shall provide free of charge
INTAKE substation building and supply will be provided at
11 KV (medium voltage). The Ministry may request the applicant to provide a land not less than 45m x 45m for a primary substation if supply can not be given from existing network. |
12001 - 48000 | H4 |
HIGH VILTAGE CUSTOMERS (SUPPLY AT HV), MD ≤ 12000KVA |
No charge (for total connected load). The developer shall provide a land not less than 45m x 45m and build a primary Substation (66KV) as per MEW'S specifications and conditions. The developer shall also build all distribution substations and establish the distribution network within his network. |
>48000 | H4 |
HIGH VILTAGE CUSTOMERS (SUPPLY AT HV), MD ≤ 48000KVA |
No charge. As per above high voltage conditions with the addition of provision of a land not less than 120m x 120m for an additional primary substation (220KV). |
5. SHIFT OF METER POSITION (U/G SERVICE):
CLASS |
CONDITION |
CC (BD) |
---|
M1 | 60A main cutout | 250 |
M2
| 100A main cutout | 300 |
M3 | 160A main cutout | 400 |
M4 | 250A main cutout | 400 |
M5 | 500A main cutout/ MCCB/ ACB | 800 |
M6 | 800A ACB | 800 |
M7 | 1600A ACB | 800 |
M8 | 2500A ACB | 800 |
M9 | Shifting Substation | FULL COST |
6. SHIFT OF METER POSITION (O/H SERVICE):
CLASS |
CONDITION |
CC (BD) |
---|
B1 | Change from O/H service to U/G service | 150 |
B2 | Change of meter position (not exceeding 10m) | 30 |
B3 | Change of service bracket position (not exceeding 10m) | 40 |
B4 | Supply of additional cutout with no change in load
(split) | 30 |
B5 | Temporary meter supplied from applicant existing main service
| 30 |
7. ADDITIONAL LOAD APPLICATIONS:
CLASS |
CONDITION |
CC (BD) |
---|
A1 | Meter only applications ( No change in Cutout ) | PER KVA |
A2
| Upward rating cutout size
to 100A, 4Cx70mm |
PER KVA |
A3 | Upward rating cutout size
to 160A, 4Cx120mm |
PER KVA |
A4 | Upward rating cutout size
to 250A, 4Cx240mm |
PER KVA |
A5
| Upward rating cutout size
to 500A, 2 No 4Cx240mm |
PER KVA |
A6 | Upward rating cutout/ ACB size to 800A |
PER KVA |
A7 | Upward rating cutout/ ACB size to 1600A |
PER KVA |
A8 | Upward rating cutout/ ACB size to 2500A |
PER KVA |
A9 | Upward rating cutout of 3 phase, 60A 2No. 2Cx35mm O/H service |
PER KVA |
A10 | Upward rating cutout of 3 phase, 100A 2No. 2Cx35mm O/H service |
PER KVA |
Note: - For
shifting of meter with
additional load requiring change of C/O, additional load charges to be applied.
- For
shifting of meter with
additional load requiring change of C/O, both additional load and shift of meter charges to be applied.
|
8. EXTENDING N/W (U/G OR O/H) EXCLUSIVE FOR THE APPLICANT:
CLASS |
DECRIPTION OF REQUIREMENT |
CC (BD) |
---|
W1 | Cost of non recoverable assets including cost of erection and dismanting of plant extended within applicant's property or through unapproved routes. | FULL COST with min. of per KVA charges
|
9. TEMPRORARY SUPPLY:
CLASS |
DECRIPTION OF REQUIREMENT |
---|
H1, H2, H3 | As per non domestic charges: LV SUPPLY ( 35 BD per KVA with min. of BD 250) MV SUPPLY ( 15 BD per KVA ) |
10. OTHER CUSTOMER REQUESTS:
CLASS |
DECRIPTION OF REQUIREMENT |
CC (BD) |
---|
R1 | Shift Wall Box exclusively feeding the customer and retain O/H service. |
150/- |
R3 | Retire Wall Box exclusively feeding the customer and change to U/G service. |
150/- |
R3 | Shift Wall Box feeding a number of customers. | No charge |
R4 | Change from O/H to U/G service. | 150/- |
R5 | Removal of O/H or U/G in conflict with a land being private prior to extending the network. |
No charge |
R6 | Removal of U/G in conflict with a corner plot, new extension, plots allocated after extending network. |
Full cost |
R7 | Removal of O/H (lines, poles, stays) in conflict or in close proximity with existing buildings. |
No charge |
R8
| Removal of O/H (lines, poles, stays) in conflict with corner plot, new extension, plots allocated after extending network requiring:
* Change or shift of the customer service. * Otherwise.
| As per change/ shift of service
No charge
|
R9 | Removal of O/H or U/G main extended within applicant property exclusively to serve his premises. |
Full cost |
R10 | Removal of O/H or U/G main extended within applicant property to serve neighboring premises. |
No charge |
APPENDIX 1
CABLE SIZE V.S MAXIMUM DEMAND TABLE
- U/G SERVICE:
CODE |
MD (KVA) |
CABLE SIZE (mm sq) |
Cut-out or Circuit Breaker |
---|
C1 | 1 - 40
| 4 x 25 Al.
| 60 A C/O |
C2 | 41 - 70
| 4 x 70 Al. | 100 A C/O |
C3 | 71 - 100
| 4 x 120 Al.
| 160 A C/O |
C4 | 101 - 170
| 4 x 240 Al.
| 250 A C/O |
C5 | 171 - 340
| 2 No. 4 x 240 Al.
| 500 A MCCB/ ACB |
C6 | 341 - 500
| 4 No. 1 x 500 Cu.
| 800 A ACB |
C7 | 501 - 1000
| 7 No. 1 x 500 Cu.
|
1600 A ACB |
C8 | 1001 - 1500
| 4 No. 1 x 1000 Cu.
|
2500 A ACB |
-
O/H SERVICE:
CODE |
MD (KVA) |
CABLE SIZE (mm sq) |
Cut-out or Circuit Breaker |
---|
L1 | 1 - 14
| Single Phase 2C x 35 Cu.
| 60 A C/O |
L2 | 15 - 40
| Three Phase 2 No. 2C x 35 Cu. | 60 A C/O |
L3 | 41 - 70
| Three Phase 2 No. 2C x 35 Cu. | 100 A C/O |
APPENDIX 2
SUBSTATION DEDUCTION TABLE
CODE |
S/S TYPE |
DEDUCTION (BD) |
---|
S1
| Single Tx S/S bldg.
| 4500 |
S2
| Double Tx S/S bldg. | 7500 |
S3
| 3 Tx S/S Bldg./ 4 Tx bldg.
| 8500 |
S4
| Construction of PU plinth
| 500 |
S5
| Construction of building package unit
| 2700 |
S6
| Additional deduction in case of provision of substation doors and accessories by the applicant (per door)
| 700 or full cost - whichever is less |
*Doors, padlocks, padbars and lovers will be provided by EDD.
APPENDIX 3
CUSTOMER CODES
01 Government |
40 MoWH Gift Plots (finance by MoWH) |
03 Mosque/ Mattam |
50 MoWH Houses (finance by MEW) |
05 Royal Court |
60 Additional Load |
10 Private |
70 Splitting Installations/ Reinf. and Street Lighting |
20 Commercial |
80 Rewiring Installations/ Diversions/ UG |
30 Industrial |
90 Temporary Supply/ Retirement |