​​​​​​​​​​​​​Definitions:

Voltage Levels:

  • Low Voltage (LV): Connection to Ministry of Electricity & Water's (MEW) network at voltage of 415 volts phase to phase.
  • Medium Voltage (MV): Connection to Ministry of Electricity & Water's (MEW) network at voltage level of 11000 volts (11KV) phase to phase.
  • High Voltage (HV): Connection to Ministry of Electricity & Water's (MEW) network at voltage level exceeding Medium Voltage.


Domestic​:

Power supply to all single occupancy premises for domestic usage such as private villas, traditional houses and government housing schemes (villas), labour camps and flats.


Government Builidings​:

Power supply to all types of government buildings such as:

  • Government Hospitals/Health Centers
  • Government Housing Flats
  • Government Pumping Stations (Sewerage/Water)
  • Government Schools/ Universities/ Stadiums/ Libraries/ Laboratories
  • Police or fire Stations/ Traffic Lights/ Airports/ Seaports
  • Non-profit Charities/ National Clubs Licensed and supported by Ministry


Exempted Buildings:

Buildings and premises being exempted from capital contribution fees according to Cabinet Orders.


Other Buildings (Non-Domestic):​

All types of premises not included above such as:

  • Staircase/ Guardrooms/ Offi​ces​
  • Hotels/ Restaurants/ Banks/ Commercial Centers/ Commercial Malls/ Theaters/ Cinemas
  • Shops/ Cold Stores/ Showrooms/ Supermarkets/ Stores
  • Private Hospitals/ Health Centers/ Clinics
  • Workshops/ Factories/ Garages
  • Fuel Filling Stations/ Printing Agencies/ Agriculture Facilities
  • Companies/ Banks
  • Private Clubs/ Resorts/ Parks/ Gardens/ Health Clubs/ Swimming Pools/ Other Recreational Facilities
  • Temporary Supply
  • Signboards
  • Private Universities/ Schools/ Laboratories


General Policy:

  • No new connection from Wall Boxes.
  • Supply points shall not exceed 10 m for each service. Applicant must pay for extra length of services.
  • Where type of premises is to be changed, a re-wiring application shall be submitted for total load.
  • For low voltage customers with loads exceeding 340 KVA , the developer shall provide distribution substation building to the requirements of Electricity Distribution Directorate. For loads below 340 KVA, EDD may request the developer to provide substation building if needed. The developer will be compensated for building the substation as per the deduction table in Appendix 2. If the capital contribution is less than the deduction, the customer will be compensated by the remaining amount.
  • For non-domestic buildings comprising combination of flats and others, medium/ high voltage supply conditions to be applied for maximum demand exceeding 3500 KVA.

Capital Contribution (Electricity) ​

1. NEW APPLICATIONS (DOMESTIC/ GOVERNMENT BUILIDING):

M​AX​
DEMAND
(KVA)
DOMESTIC/ GO​VERNMENT (EXCLUDING FLATS)
CLASS. CC (BD)
1-170 D1 10 PER KVA
>170​ D2 20 PER KVA for part of load exceeding 170 KVA
  D3 Minimum charge of BD 250/- p​er main service

 

D4 Exempted building ( no charge )*
NOTE:
  • Deduction for building substation room is as per deduction table.
  • Minimum capital contribution is 250/- BD for any new main service (U/G or O/H)
  • Exemptions are subject to Prime Minister's Office Orders.

           *Same classification code can be used for any type of building being exempted from capital contribution fees.

​ 

2. NEW APPLICATIONS ( FLATS):

MAX
DEMAND
(KVA)

FLATS

CLASS.

CC (BD)

1-170

F1

15 PER KVA

171 - 5000

F2

35 PER KVA for part of load exceeding 170 KVA

 

F3

Minimum charge of BD 250/- per main service

NOTE:

  • Deduction for building substation room is as per deduction table.
  • Minimum capital contribution is 250/- BD for any new main service (U/G or O/H)
  • CC is based on total maximum demand of all flats.
  • Above rates to be used even if the flats are part of non-domestic buildings supplied at low voltage.
  • Maximum demand is excess of 5000 KVA to be a medium/ high voltage customer.


 

3. NEW APPLICATIONS ( NON-DOMESTIC BUILDINGS):

MAX
DEMAND
(KVA)

FLATS

CLASS.

CC (BD)

1-3500

H1

35 PER KVA

 

H2

Minimum charge of BD 250/- per main service

NOTE:

  • Deduction for building substation room is as per deduction table.
  • Minimum capital contribution is 250/- BD for any new main service (U/G or O/H)
  • Maximum demand is excess of 3500 KVA to be a medium/ high voltage customer.


 

4. NEW APPLICATIONS (MEDIUM/ HIGH VOLTAGE CUSTOMERS):

​​MAX
DEMAND
(KVA)

MEDIUM VOLTAGE CUSTOMERS

CLASS.

CC (BD)

 

≤12000

 

H3

MEDIUM VILTAGE CUSTOMERS (SUPPLY AT 11KV),
MD ≤ 12000KVA

15 per KVA
The developer shall provide free of charge INTAKE substation building and supply will be provided at 11 KV (medium voltage).
The Ministry may request the applicant to provide a land not less than 45m x 45m for a primary substation if supply can not be given from existing network.

 

12001 - 48000

 

H4

HIGH VILTAGE CUSTOMERS (SUPPLY AT HV),
MD ≤ 12000KVA

No charge (for total connected load).
The developer shall provide a land not less than 45m x 45m and build a primary Substation (66KV) as per MEW'S specifications and conditions. The developer shall also build all distribution substations and establish the distribution network within his network.

 

>48000

 

H4

HIGH VILTAGE CUSTOMERS (SUPPLY AT HV),
MD ≤ 48000KVA

No charge.
As per above high voltage conditions with the addition of provision of a land not less than 120m x 120m for an additional primary substation (220KV).


 

5. SHIFT OF METER POSITION (U/G SERVICE):

CLASS

CONDITION

CC (BD)

M1

60A main cutout

250

M2

100A main cutout

300

M3

160A main cutout

400

M4

250A main cutout

400

M5

500A main cutout/ MCCB/ ACB

800

M6

800A ACB

800

M7

1600A ACB

800

M8

2500A ACB

800

M9

Shifting Substation

FULL COST


 

6. SHIFT OF METER POSITION (O/H SERVICE):

CLASS

CONDITION

CC (BD)

B1

Change from O/H service to U/G service

150

B2

Change of meter position (not exceeding 10m)

30

B3

Change of service bracket position (not exceeding 10m)

40

B4

Supply of additional cutout with no change in load (split)

30

B5

Temporary meter supplied from applicant existing main service

30


 

7. ADDITIONAL LOAD APPLICATIONS:

CLA​SS

CONDITION

CC (BD)

A1

Meter only applications ( No change in Cutout )

PER KVA

A2

Upward rating cutout size to 100A, 4Cx70mm

PER KVA

A3

Upward rating cutout size to 160A, 4Cx120mm

PER KVA

A4

Upward rating cutout size to 250A, 4Cx240mm

PER KVA

A5

Upward rating cutout size to 500A, 2 No 4Cx240mm

PER KVA

A6

Upward rating cutout/ ACB size to 800A

PER KVA

A7

Upward rating cutout/ ACB size to 1600A

PER KVA

A8

Upward rating cutout/ ACB size to 2500A

PER KVA

A9

Upward rating cutout of 3 phase, 60A 2No. 2Cx35mm O/H service

PER KVA

A10

Upward rating cutout of 3 phase, 100A 2No. 2Cx35mm O/H service

PER KVA

Note:

  • For shifting of meter with additional load requiring change of C/O, additional load charges to be applied.
  • For shifting of meter with additional load requiring change of C/O, both additional load and shift of meter charges to be applied.


 

8. EXTENDING N/W (U/G OR O/H) EXCLUSIVE FOR THE APPLICANT:

CLASS

​​DECRIPTION OF REQUIREMENT

CC (BD)

W1

Cost of non recoverable assets including cost of erection and dismanting of plant extended within applicant's property or through unapproved routes.

FULL COST with min.
of per KVA charges


 

9. TEMPRORARY SUPPLY:

CLASS

DECRIPTION OF REQUIREMENT

H1, H2, H3

As per non d​omestic charges:
LV  SUPPLY        ( 35 BD per KVA with min. of BD 250)
MV SUPPLY        ( 15 BD per KVA )

 

10. OTHER CUSTOMER REQUESTS:

CLASS

​DECRIPTION OF REQUIREMENT

CC (BD)

R1

Shift Wall Box exclusively feeding the customer and retain O/H service.

150/-

R3

Retire Wall Box exclusively feeding the customer and change to U/G service.

150/-

R3

Shift Wall Box feeding a number of customers.

No charge

R4

Change from O/H to U/G service.

150/-

R5

Removal of O/H or U/G in conflict with a land being private prior to extending the network.

No charge

R6

Removal of U/G in conflict with a corner plot, new extension, plots allocated after extending network.

Full cost

R7

Removal of O/H (lines, poles, stays) in conflict or in close proximity with existing buildings.

No charge

​  R8

Removal of O/H (lines, poles, stays) in conflict with corner plot, new extension, plots allocated after extending network requiring:

* Change or shift of the customer service.

* Otherwise.

As per change/ shift of service

No charge​

R9

Removal of O/H or U/G main extended within applicant property exclusively to serve his premises.

Full cost

R10

Removal of O/H or U/G main extended within applicant property to serve neighboring premises.

No charge


 

APPENDIX 1
CABLE SIZE V.S MAXIMUM DEMAND TABLE

- U/G SERVICE:

CODE

MD (KVA)

CABLE SIZE (mm sq)

Cut-out or Circuit Breaker

C1

1 - 40

4 x 25 Al.

60 A C/O

C2

41 - 70

4 x 70 Al.

100 A C/O

C3

71 - 100

4 x 120 Al.

160 A C/O

C4

101 - 170

4 x 240 Al.

250 A C/O

C5

171 - 340

2 No. 4 x 240 Al.

500 A MCCB/ ACB

C6

341 - 500

4 No. 1 x 500 Cu.

800 A  ACB

C7

501 - 1000

7 No. 1 x 500 Cu.

1600 A  ACB

C8

1001 - 1500

4 No. 1 x 1000 Cu.

2500 A  ACB

-
 O/H SERVICE:

​CODE

MD (KVA)

CABLE SIZE (mm sq)

Cut-out or Circuit Breaker

L1

1 - 14

Single Phase 2C x 35 Cu.

60 A C/O

L2

15 - 40

Three Phase 2 No. 2C x 35 Cu.

60 A C/O

L3

41 - 70

Three Phase 2 No. 2C x 35 Cu.

100 A C/O

 

APPENDIX 2
SUBSTATION DEDUCTION TABLE

CODE

S/S TYPE

DEDUCTION (BD)

S1

Single Tx S/S bldg.

4500

S2

Double Tx S/S bldg.

7500

S3

3 Tx S/S Bldg./ 4 Tx bldg.

8500

S4

Construction of PU plinth

500

S5

Construction of building package unit

2700

S6

Additional deduction in case of provision of substation doors and accessories by the applicant (per door)

700 or full cost - whichever is less

           *Doors, padlocks, padbars and lovers will be provided by EDD.
 

APPENDIX 3
CUSTOMER CODES

01 Government

40 MoWH Gift Plots (finance by MoWH)

03 Mosque/ Mattam

50 MoWH Houses (finance​ by MEW)

05 Royal Court

60 Additional Load

10 Private

70 Splitting Installations/ Reinf. a​nd Street Lighting

20  Commercial

80 Rewiring Installations/ Diversions/ UG

30 Industrial

90 Temporary Supply/ Retirement

​​