PLANNING ST AGE
A/ Benayat System -main features :
- Submitting the application by the Publisher Engineering office.
- Review of the application by the Reviewer Engineering office.
- Attaching the water supply layout and schematic drawings.
- Issuing the building permit after paying the fees for the municipality.
- Audit the water supply layout and schematic drawings by Water Conservation Section.
- Where the drawing is not matching the Water Regulations, they should be resubmitted after correction.
B/ One stop shop System -main features :
- Attaching the water supply layout and schematic drawings.
- Reviewing the water supply layout and schematic drawings by Water Conservation Section.
- The approved or rejected applications will be returned to the One Stop Shop.
- Resubmitting the rejected applications to Water Conservation Section after correction.
IMPLEMENTATION STAGE -main features :
1. Submit the plumber compliance form to the Customer Service Directorate if the site is prepared and in compliance with water regulations.
- Submitting power meter application to the Customer Service Directorate.
- Water Conservation Section receives the applications through the OUC system.
- Arranging an appointment with the licensed plumber.
- Site inspection .
- If the site is fulfilling Water Regulations, the application to be approved in OUC and send to Customer Service Directorate.
- If the site is not fulfilling Water Regulations, another appointment to be arranged after correcting the violations.
To see
Manual for
Premises Internal Plumbing network , please
click here ..
To see
water meter arrangement installation , please
click here ..